All Bridge Approach Pavement |
10/21/2025 |
Transportation |
Standard Road Plans |
Longitudinal Joint (PV-101): Single pour - Saw cut joint per Detail B. Two pours - Use 'KS-1' joint. Joint at end of Bridge Rail End Section: Place j... |
 |
113-10 - Sidewalk Compliance - Data should be imported into Design Tabulations for final use |
10/21/2025 |
Transportation |
Road Design Details |
Staking required by Contracting Authority per Article 2511.03 of the Standard Specifications. Refer to tabulation 113-01 for bid quantities. |
 |
BR-101 Bridge Approach Section (General Details) |
10/21/2025 |
Transportation |
Standard Road Plans |
Closed Cell Backer Rod (minimum 25% larger than joint opening) 14 Tire Buffings. Longitudinal Joint (PV-101): Single pour - Saw cut joint per Detail ... |
 |
All Barriers |
10/21/2025 |
Transportation |
Standard Road Plans |
TITLE Steel Beam Guardrail Installation at Side Object (Two-Way Protection) Steel Beam Guardrail Installation at Side Object (One-Way Protection) Stee... |
 |
BR-201 Double Reinforced 10" Approach |
10/21/2025 |
Transportation |
Standard Road Plans |
Longitudinal Joint (PV-101): Single pour - Saw cut joint per Detail B. Two pours - Use 'BT-2' Joint. Joint at end of Bridge Rail End Section: Place j... |
 |
BA-250 - Steel Beam Guardrail Installation at Concrete Barrier or Bridge Rail End Section (MASH TL-3) |
10/21/2025 |
Transportation |
Standard Road Plans |
or St eelBeam Guardrai lFl aredEndTermi nal f orCabl eConnect i on. V (M ar u i a l t b i pl e l eF ol f a6 re ' -3") VF. NEAREST TRAFFIC Rail Eleme... |
 |
BR-204 Double Reinforced 12" Approach with Variable Depth Paving Notch |
10/21/2025 |
Transportation |
Standard Road Plans |
" dia. x 24" Steel Rod, place at 32" + Spacing full length of Paving Notch through drilled holes 4 3" thick x 16" wide Resilient Joint Filler placed f... |
 |
BA-251 - Steel Beam Guardrail Installation at Side Object (Two-Way Protection) |
10/21/2025 |
Transportation |
Standard Road Plans |
P Sa t e yel l eB ng et a hmf oG r: uardrai l (vari es). Install delineators and object markers according to SI-211. For general guardrail details, ... |
 |
BR-205 Double Reinforced 12" Approach (Slab Bridge) |
10/21/2025 |
Transportation |
Standard Road Plans |
Quantities for both the 1'-9" top part of the sleeper slab and the 6'-3" portion under the approach pavement have been included in the double reinforc... |
 |
BA-252 - Steel Beam Guardrail Installation at Side Object (One-Way Protection) |
10/21/2025 |
Transportation |
Standard Road Plans |
Vari abl e Fl are (Mul t i pl eof6. LOCATION STATION AT POST P Sa t e yel l eB ng et a hmf oG r: uardrai l (vari es). For general guardrail details,... |
 |
BR-231 Bridge Approach (Multi-Lane, Curbed Roadway) |
10/21/2025 |
Transportation |
Standard Road Plans |
CL Approach Roadway CL Approach Roadway. Longitudinal Joint (PV-101): Single Pour - Saw cut joint per Detail B . Double Reinforced Section Single Re... |
 |
BA-260 - Steel Beam Guardrail Installation at Concrete Barrier or Bridge Rail End Section (MASH TL-2) |
10/21/2025 |
Transportation |
Standard Road Plans |
V (M ar u i a l t b i pl e l eF ol f a6 re ' -3") VF Face of Guardrail. For general guardrail details, see BA-200. See BA-202 for connections to con... |
 |
All Drainage |
10/21/2025 |
Transportation |
Standard Road Plans |
SECTION OF PIPE CONNECTOR (Concrete Pipe to Corrugated Pipe). SECTION OF PIPE CONNECTOR (Concrete Pipe to Concrete Pipe). Aprons may be attached to ... |
 |
BR-202 Double Reinforced 10" Approach with Variable Depth Paving Notch |
10/21/2025 |
Transportation |
Standard Road Plans |
" dia. x 24" Steel Rod, place at 32" + Spacing full length of Paving Notch through drilled holes 4 3" thick x 16" wide Resilient Joint Filler placed f... |
 |
BA-250 - Steel Beam Guardrail Installation at Concrete Barrier or Bridge Rail End Section (MASH TL-3).dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
For general guardrail details, see BA-200. See BA-202 for connections to concrete barriers and bridge rail end sections. For 12.5 feet longitudinall... |
 |
BR-203 Double Reinforced 12" Approach |
10/21/2025 |
Transportation |
Standard Road Plans |
Expansion Joint on Bridge Final Grade Line Approach Pavement Dowel to be Placed with Bridge. Debond paving notch with two layers of 30# asphaltic fel... |
 |
BA-251 - Steel Beam Guardrail Installation at Side Object (Two-Way Protection).dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
For general guardrail details, see BA-200. When design speed is less than 55mph 10:1 flare may be used. For 12.5 feet longitudinally the offset will... |
 |
BR-211 Bridge Approach (Abutting PCC or Composite Pavement) |
10/21/2025 |
Transportation |
Standard Road Plans |
Build 4 inch Sloped Curb to end of Double Reinforced Section. Refer to PV-102 for curb and runout details. Longitudinal Joint (PV-101): Single Pour ... |
 |
BA-252 - Steel Beam Guardrail Installation at Side Object (One-Way Protection).dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
For general guardrail details, see BA-200. When design speed is less than 55mph 10:1 flare may be used. For 12.5 feet longitudinally the offset will... |
 |
BR-212 Bridge Approach (Abutting HMA Pavement) |
10/21/2025 |
Transportation |
Standard Road Plans |
Pay limits for contract item include the following areas: Double Reinforced Section Single Reinforced Section Non-Reinforced Section. Build 4 inch Sl... |
 |
BR-202 Double Reinforced 10" Approach with Variable Depth Paving Notch.dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
Joint at end of Bridge Rail End Section: Place joint filler the full depth of the bridge approach pavement. In areas with curb, place full depth of p... |
 |
BR-241 Double Reinforced 10” Approach on Gravel Road |
10/21/2025 |
Transportation |
Standard Road Plans |
If bridge is skewed, place additional #5 bar parallel to skewed face. " dia. x 24" Steel Rod, Place at 3-2" + Spacing Full Length of Paving Notch thr... |
 |
BR-203 Double Reinforced 12" Approach.dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
Joint at end of Bridge Rail End Section: Place joint filler the full depth of the bridge approach pavement. In areas with curb, place full depth of p... |
 |
DR-502 Slotted Drain for Median Crossovers |
10/21/2025 |
Transportation |
Standard Road Plans |
Limits of 18'' CMP and Slotted Drain Slotted Drain Length SDL CLMedian Crossover PROFILE GRADE. During construction of crossover pavement, cover slot... |
 |
BR-205 Double Reinforced 12" Approach (Slab Bridge).dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
inch thick x 16 inch wide Resilient Joint Filler for full length of Sleeper Slab. Quantities for both the 1'-9" top part of the sleeper slab and the ... |
 |
All Erosion Control |
10/21/2025 |
Transportation |
Standard Road Plans |
TITLE Wood Excelsior Mat for Ditch Protection Sod for Ditch Protection Wood Excelsior Mat for Slope Protection Turf Reinforced Mat (TRM) Transition Ma... |
 |
BR-211 Bridge Approach (Abutting PCC or Composite Pavement).dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
Build 4 inch Sloped Curb to end of Double Reinforced Section. Refer to PV-102 for curb and runout details. Longitudinal Joint (PV-101): Single Pour ... |
 |
BA-260 - Steel Beam Guardrail Installation at Concrete Barrier or Bridge Rail End Section (MASH TL-2).dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
For general guardrail details, see BA-200. See BA-202 for connections to concrete barriers and bridge rail end sections. For 12.5 feet longitudinall... |
 |
BR-212 Bridge Approach (Abutting HMA Pavement).dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
Build 4 inch Sloped Curb to end of Double Reinforced Section. Refer to PV-102 for curb and runout details. Longitudinal Joint (PV-101): Single Pour ... |
 |
BR-101 Bridge Approach Section (General Details).dgn |
10/21/2025 |
Transportation |
Standard Road Plans |
Longitudinal Joint (PV-101): Single pour - Saw cut joint per Detail B. Two pours - Use 'KS-1' joint. This 'BE' joint and the setting temperatures may... |
 |